Snack Bags Bottom Sealing Machine 4.85kw 150pcs/Min
Product Details:
Place of Origin: | JIANGYIN |
Brand Name: | XINLEI |
Certification: | Letters Patent |
Model Number: | XLDF-500 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1set |
---|---|
Price: | Negotiable |
Packaging Details: | Wrapping Film |
Delivery Time: | 15-20 work days |
Payment Terms: | L/C, T/T |
Supply Ability: | 4 set per month |
Detail Information |
|||
Bag Type: | Snack Bags | Machine Type: | Bag Making Machine |
---|---|---|---|
Voltage: | 220V-380V50Hz | Material: | LDPE HDPE Etc. |
Condition: | New | Weight: | 1800kg |
Warranty: | 1 Year | Power: | 4.85kw |
High Light: | Snack Bags Bottom Sealing Machine,Bottom Sealing Machine 150pcs min,bottom cutting sealing machine 4.85kw |
Product Description
Bottom Bag Making Machine Of Snack Bags
The machien main control center adopts PLC touch screen to display bag making speed,bag making length setting and automatic bag making counting.The whole equipment adopts steel plate structure.Out feeding and rewinding are controlled by servo motor.The machine will alarm when have no material.
Main Technical Parameters
Material | HDPE,LDPE,etc. |
Unwinding Width | ≤400mm |
Unwinding Diameter | ≤800mm |
Bag Speed | ≤100pcs/min |
Machine Speed | 150pcs/min |
Bag Width | ≤400mm |
Bag Length | ≤500mm |
Power Supply | 220V-380V50Hz |
Total Power | 4.85KW |
Dimension | 4300*1200*1600mm |
Machine Weight | 1800KG |
Pictures as reference
Detailed Images
About Us
Jiangyin ShiXuan Machinery is an integrated company which has gathered development, researching, manufacturing and marketing together. The company abides by the purpose of ′Innovation drives development, quality wins the market′.
Our company can supply customized service for global customers. According to customers′ demand, we can design products and supply long term integrative service of producing, installing and debugging. For service, our company can supply long term technical.
FAQ
1. How long will your engineer reach to our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 5days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also car fare.
4. How long of your machine's warranty period?
All our machines have one year guarantee after finishing installation.
5. How could we do after one year warranty period?
We also can offer you our best after service, of course you will afford our technician's cost.