Bottom Sealing FFS Heavy Duty Bag Making Machine 12kw
Product Details:
Place of Origin: | JIANGYIN |
Brand Name: | XINLEI |
Certification: | Letters Patent |
Model Number: | XLZB-700 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1set |
---|---|
Price: | Negotiable |
Packaging Details: | Wrapping Film |
Delivery Time: | 30-40 work days |
Payment Terms: | L/C, T/T |
Supply Ability: | 1 set per month |
Detail Information |
|||
Voltage: | 220V/380V50HZ | Condition: | New |
---|---|---|---|
Driven Type: | Electric,Pneumatic | Application: | Machinery & Hardware |
After-sales Service Provided: | Online Support,Video Technical Support | Power: | 12kw |
Warranty: | 1 Year | Material: | HDPE,LDPE |
Highlight: | FFS Heavy Duty Bag Making Machine,Heavy Duty Bag Making Machine,Bottom Sealing Machine 12kw |
Product Description
Bottom Sealing Heavy Bag Making Machine For FFS Bag
The machine adopts steel plate and steel frame structure.
The control center adopts PLC and touch screen.The machine has programmable controller by PLC for center control system and touch screen for clear display and easy operation.
The feeding part adopts servo motro with servo drivers.The machine is equipped with 2 sets hot pinhole device.
New design sealing bar structure can adjust pressure and duration separately. PLC allows auto temperature control, which ensures nice and reliable sealing line of different thickness and materials.
Main Technical Parameters
Material | HDPE LDPE |
Unwinding Width | ≤700mm |
Unwinding Diameter | ≤1500mm |
Machine Speed | 35pcs/min |
Bag Width | ≤600mm |
Bag Length | ≤1100mm |
Power Supply | 220V-380V50Hz |
Total Power | 12 |
Machine Weight | 2800kg |
Dimension | 9900*1400*1600mm |
Pictures as referencr
Detailed Images
About Us
Jiangyin ShiXuan Machinery is an integrated company which has gathered development, researching, manufacturing and marketing together. The company abides by the purpose of ′Innovation drives development, quality wins the market′.
Our company can supply customized service for global customers. According to customers′ demand, we can design products and supply long term integrative service of producing, installing and debugging. For service, our company can supply long term technical.
FAQ
1. How long will your engineer reach to our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 5days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also car fare.
4. How long of your machine's warranty period?
All our machines have one year guarantee after finishing installation.
5. How could we do after one year warranty period?
We also can offer you our best after service, of course you will afford our technician's cost.